## Что это
## Резюме (RU)
Goal 2 — Integration Constellation: фреймворк + 2 новые интеграции
*Полный перевод тела — в работе. Английский оригинал ниже.*
---
# Original (EN)
## Objective
**Goal 2 — Integration Constellation**: every integration is a native sense organ of ROX.ONE; we land 2 more integrations this quarter (T271 artifacts + Browser-as-tool) on a shared framework; Rox Design refactors onto same framework. 6 areas × \~4-8 sub-objectives = 26 sub-objectives / 74-94 tasks / \~11-15 dev-weeks.
> Vision: "ROX.ONE evolves from a chat-app-with-one-design-tool into a workbench where multiple integrations each feel native, compound via agent workflows, and obey the same trust/UX/observability contract."
## Source Links
* Design doc: `docs/superpowers/specs/2026-05-20-rox-integration-vision-design.md`
* Audit context: `docs/audits/2026-05-20-pr268-release-readiness-audit.md`
* T271 active work: [PZD-10](https://linear.app/id-2/issue/PZD-10), [PZD-35](https://linear.app/id-2/issue/PZD-35)
## Requirements (summary)
6 areas: framework primitives (manifest/lifecycle/sandbox/skin/navigation/telemetry/capability/budget), test infrastructure, T271-as-first-consumer, Browser-as-tool-as-second, Rox Design refactor, playbook+docs. Full breakdown in design doc Section 3.
## Acceptance Criteria (vision-level)
1. T271 ships on framework (or absorbs into framework ≤1 dev-day post-landing).
2. Browser-as-tool ships as new integration (≤200 LoC manifest + custom code, smell-check).
3. Rox Design refactor: zero functional regression + ≥40% bespoke LoC reduction.
4. Playbook published; new integration can be stood up in ≤1 day using docs.
5. Framework test infrastructure exists (closes Lane C \~0% coverage gap).
## Implementation Plan
Sections 3 + 4 of design doc. Foundation (Week 0) starts now: manifest schema + sandbox baseline + mock test infra.
## Status / Priority / Estimate
Status: **In Progress**
Priority: **High**
Estimate: **XL** (11-15 dev-weeks)
Workstream: КОД (with PM coordination for T271 sequencing)
## Update Log
* **2026-05-20** Parent issue created; Week 0 sub-issues created concurrent.
## Статус
Это задача из текущего backlog'а ROX.ONE (Linear). Текущий статус в Linear: `К работе — Todo`. Метки: —.
## 🔗 Linear
- [PZD-77](https://linear.app/kuhjie/issue/PZD-77/goal-2-integration-constellation-frejmvork-2-novye-integracii-goal-2) — backing ticket
- Parent epic: [PZD-120](https://linear.app/kuhjie/issue/PZD-120)